A year of roof maintenance
Most of what shortens a roof is neglect of things that take twenty minutes: a blocked valley, a lifted flashing, a gutter full of grit.
Or call (562) 586-7503Get it looked at
Three questions, and up to three Pico Rivera contractors. Free either way.
Your request is in.
We are matching it now against roofing contractors working in Pico Rivera and the surrounding area.
- Today, usually within the hour. The first contractor calls or texts the number you gave us. ASAP requests go out first.
- Up to three of them, no more. We cap it at three so you can compare without your phone melting.
- They come and look. Estimates are given after somebody has been on the roof, not over the phone.
- You decide, or you do not. There is nothing to cancel and nothing to pay us.
If you do not hear anything today, check your voicemail and spam folder — contractors often call from a mobile number.
Twice a year, from the ground
You do not need to be on the roof to find most problems. A slow lap of the house at a low angle finds nearly all of them.
Cut back anything touching the roof
Branches abrade the surface in wind and drop debris that holds moisture. Keep growth well clear of the covering, and clear of the gutters while you are at it.
Clear the gutters before the wet season
Blocked gutters back water up under the bottom course of shingles and rot the fascia behind them. This is the highest-value hour of maintenance there is, and here it wants doing before November through March.
Keep the penetrations honest
Rubber pipe boots are the single most common source of leaks on an otherwise sound roof, and they are cheap to replace before they fail.
Deal with growth properly
Moss and algae hold water against the surface. Treat and brush gently, or fit zinc or copper strip near the ridge. Never pressure wash an asphalt roof — it strips the granules and takes years off it in an afternoon.
Look in the attic after heavy weather
The attic shows a leak long before the ceiling does. After any serious storm, take a torch up and look at the underside of the deck around penetrations and valleys.
In short
Put two dates in the calendar, one either side of November through March. That is the whole programme.
Related questions
What if the decking is rotten underneath?
Some of it usually is. The important thing is that the price per sheet is agreed in writing before the tear-off, so the conversation on day two is about quantity rather than rate.
Are the contractors licensed and insured?
Contractors have to give us their state licence number and proof of liability and workers compensation cover before they can receive requests. You should still ask to see current certificates yourself before work starts — a licence can lapse between checks.
Do I need a permit?
Yes, in nearly every jurisdiction a re-roof is permitted work. A contractor who suggests skipping it is telling you something useful about how they work.