Pico Rivera, CA
Roof replacement in Pico Rivera
Replacing a roof is four days of noise and one decision that lasts thirty years. It is worth an afternoon of comparing.
Describe the replacement job
Three questions, then the address. Up to three Pico Rivera contractors who do this work.
You are on the list.
No provider in Pico Rivera is taking requests through this service yet. We are lining them up, and yours is kept until one can.
- Nobody gets your details yet. Your request stays with us and is not passed to any company.
- One email when someone can help. When a provider covering your area can take it on, we email you once and ask whether you want that company, by name, to contact you.
- Deleted after 90 days. If nobody can take it on, or you do not say yes, your contact details are deleted 90 days after your request.
- You decide, or you do not. There is nothing to cancel and nothing to pay us.
Nobody will call you about this request unless you say yes to a company by name.
Before you let anybody on the roof
The things worth pinning down on a replacement job. A contractor who has not raised them has not looked properly.
- Tear-off or overlay, and what the local code allows
- How the site is protected, and who cleans up the nails
- Which underlayment, and whether ice-and-water goes on the eaves and valleys
- Who pulls the permit, and what the inspection schedule looks like
- Ventilation: what is there now, what it should be
The covering is the part you can see and the part everybody quotes on. The parts that decide whether the roof lasts are underlayment, ventilation, drip edge and how the valleys are handled.
Warranties come in two halves that get deliberately confused. The manufacturer covers the material, and only if it was installed to specification. The contractor covers the workmanship, and only for as long as they stay in business.
Insist on knowing what happens to decking that turns out to be rotten. The good answer is a per-sheet price agreed in writing before the job starts.
Locally
Then, less dramatically: ember intrusion through vents and open eaves. Most houses lost to wildfire are lost to embers arriving ahead of the fire, not to the fire itself.
About replacement here
How many contractors will contact me?
No more than three. We picked that number because two quotes is not enough to spot an outlier and five is an ordeal.
Should I take the cheapest quote?
Not automatically. Put the quotes side by side on layers, not on totals — underlayment, ice-and-water, drip edge, valley treatment, ventilation, decking allowance, warranty. Cheap usually means less of those, not the same roof for less money.
How long does a re-roof take?
Two days is typical for asphalt. Add days for steep pitch, multiple layers to strip, tile work, or a roof with a lot of valleys and penetrations.
What if the decking is rotten underneath?
Expect a few sheets on most older roofs. Get the per-sheet rate in the contract. Open-ended decking charges are where a fixed price stops being fixed.
