Guide
Making a roof damage claim
A roof claim is a documentation exercise. The damage matters, but what you can prove about it matters more.
Or call (562) 586-7503Get it looked at
Three questions, and up to three Pico Rivera contractors. Free either way.
Your request is in.
We are matching it now against roofing contractors working in Pico Rivera and the surrounding area.
- Today, usually within the hour. The first contractor calls or texts the number you gave us. ASAP requests go out first.
- Up to three of them, no more. We cap it at three so you can compare without your phone melting.
- They come and look. Estimates are given after somebody has been on the roof, not over the phone.
- You decide, or you do not. There is nothing to cancel and nothing to pay us.
If you do not hear anything today, check your voicemail and spam folder — contractors often call from a mobile number.
Read anything before you sign it
An assignment of benefits hands control of your claim to a contractor. There are legitimate uses for it and it is also the single most common way homeowners lose control of a claim. Never sign one on the doorstep.
Know what your policy actually pays
The two clauses that decide the cheque are the settlement basis and the deductible. Some policies also carry a separate, larger deductible for wind and hail.
Stop further damage, and keep the receipts
Policies expect you to take reasonable steps to prevent things getting worse, and they generally reimburse the cost of doing so. Tarps, emergency call-outs, a temporary patch. Keep every receipt.
Photograph everything, immediately
Take far more pictures than feel necessary, including undamaged areas for comparison. Do it before the tarp goes on, not after.
Get an independent assessment first
A written contractor assessment before the adjuster visits gives you a scope to compare against. If the two disagree, ask for the contractor to be present at a re-inspection — it changes the conversation considerably.
Mind the deadline
Report promptly even if you have not decided what to do. The clock in the policy runs from the date of the event, not the date you noticed.
In short
Document first, mitigate second, file third. In that order it usually goes smoothly; in any other order it usually does not.
Related questions
How many contractors will contact me?
No more than three. We picked that number because two quotes is not enough to spot an outlier and five is an ordeal.
Should I take the cheapest quote?
Not automatically. Put the quotes side by side on layers, not on totals — underlayment, ice-and-water, drip edge, valley treatment, ventilation, decking allowance, warranty. Cheap usually means less of those, not the same roof for less money.
How long does a re-roof take?
Two days is typical for asphalt. Add days for steep pitch, multiple layers to strip, tile work, or a roof with a lot of valleys and penetrations.
Get it priced
No cost, no obligation, and never more than three contractors.